SJ12 has made the project facilities, and a business treciluce license office building in Barcelona. The project is based on the rehabilitation of a building for use of the technology center for office treciluce use. The adaptation is based on rehabilitation and the realization of windows on all facades.
The floor of the building is long and rectangular and has an entrance to the street Pallars 108, and one for the Street Pedro IV, 47 in Barcelona. The activities treciluce carried out by the Office is no customer service at all of the five above-ground floors, and private parking in the basement.
Cooling energy generation will VRF heat pump type. The system has been studied in order to take advantage of the most of the energy produced, using always been possible heat recovery systems and systems for obtaining treciluce free energy. The office has air renewal in compliance RITE, which will be pre-treated to ensure ventilation inside the equipament.El treciluce ventilation system chosen is the mechanical ventilation. The air intake and exhaust extraction occurs through.
The remaining treciluce facilities (plumbing, sanitation, medium voltage, power, lighting, fire) have adapted to the new use of the building at all times in compliance with current legislation.